Change and Challenge ICT Construction Stage Ⅱ
Eliminating inefficiencies in construction through more precise planning enabled by digital technology
新技術へのワクワクが未来を切り開く! 働き方や施工のあり方を再定義する遠隔操作
なぜ「遠隔施工」を始めたのか? 遠隔施工が切り拓く、建設業の働き方改革
3K「きつい・汚い・危険」を「らく・きれい・安全」へ
Utilizing 3D Terrain Data for Typhoon Disaster Prevention
Understand Water Movement Before the Typhoon
Understanding the fill volume over existing box culverts
No Need for Drawings — Instantly Grasp Fill Volume
Soil allocation management through accurate volume estimation and optimized construction planning
Schedule Recovery and Cost Reduction Enabled by Simulation-Based Construction Planning and On-Jobsite Coordination
Plan optimization driven by dump truck driving history
Data-Driven Simulation for Realistic Planning
Verifying the feasibility of the initial plan through simulation analysis
Simulation-based optimization shortened the schedule by one month and enabled flexible workflow adjustments.